Comfort House Construction Progress

ch-20161005_111303

Comfort House, seen from the Bicentennial Chapel (October 5, 2016)

ch-20161004_130122

Warren Hudson installing wainscoting in the Taylor Parlor (October 4, 2016)

ch-20161004_114328

Beautiful new copper roof, a gift of N.B. Handy and Bruce Christian (October 4, 2016)

ch-20161004_113526

Copper roof installation (October 4, 2016)

ch-20160929_150416

Installing white oak flooring (September 29, 2016)

ch-20160928_105802

Comfort House seen from Old Potter’s Field (September 28, 2016)

ch-20160927_130406

Installing beaded-board ceiling in the Taylor Parlor (September 27, 2016)

ch-20160922_173400

Comfort House and Chapel (September 22, 2016)

ch-20160916_150734

John Vincent working on lower-level porch roof (September 16, 2016)

ch-20160913_105907

Master stone mason Wesley Ward (September 13, 2016)

ch-20160913_105834

Lower-level walls (September 13, 2016)

ch-20160913_105621

Installing HVAC unit (September 13, 2016)

ch-20160901_122747

Grading around the foundation (September 1, 2016)

ch-20160831_154246

Connecting drain pipes beneath the terrace (August 31, 2016)

August 29, 2016

August 29, 2016

ch-20160817_140401

August 17, 2016

ch-20160816_103424

Installing board-and-batten siding (August 16, 2016)

ch-20160804_131352

Hanging drywall boards (August 4, 2016)

ch-20160802_133625       ch-20160802_095640

Stonework and insulation (August 2, 2016)

ch-20160729_144612

Installing siding (July 29, 2016)

ch-20160726_141812       ch-20160722_135800

July 22 and 26, 2016

ch-20160708_100420       ch-20160718_141221

July 8 and 18, 2016

ch-20160630_135205

Covering the roof (June 30, 2016)

CH-20160622_141120

Measuring for walls (June 22, 2016)

CH-20160622_134601       CH-20160622_135336

CH-20160622_134038_021

Raising Wall #2 (June 22, 2016)

CH-IMG_4460

Raising the first wall! (June 21, 2016)

Laying floor joists for the upper level (June 9, 2016)

Laying floor joists for the upper level (June 9, 2016)

ch-lower-level

Three lower-level rooms: kitchenette and two bathrooms (June 13, 2016)

20160602_084914

Lower level concrete floor poured (June 2, 2016)

20160518_141947

Laying block walls (May 18, 2016)

20160516_140329

Laying block walls for lower level (May 16, 2016)

20160516_133702       20160427_153636

Pouring the foundation (April 27, 2016) – Thank You Lynchburg Ready Mix!

CH-20160426_095315

Preparing forms for concrete footers (April 26, 2016)

CH-20160422_083300

April 22, 2016

CH-20160422_083542

April 22, 2016

Excavating the lower level (March 30, 2016)

Excavating the lower level (March 30, 2016)

CH-DSC06763

The Site “Before” (August 24, 2015)

Visit the Gravegarden

Plan Your Visit Today

Upcoming Events

View All

Contact Info

401 Taylor Street
Lynchburg, Virginia 24501

Office: (434) 847-1465
Fax: (434) 856-2004

occ@gravegarden.org
Copyright © 2019 Southern Memorial Association. All rights reserved.
Built By: 434 Marketing.